Nick Milestone, Managing Director of B & K Structures talks to Public Sector Build Journal about BIM and why it is so crucial to transforming the industry.

Gallery

The digital age is evolving. We are constantly adapting technology in order to enhance all aspects of the modern world. We have changed the way we socialise, the way we travel and the way we work in order to integrate the latest technology in our everyday lives.

Building Information Modelling (BIM) is at the front and centre of the latest digital technology in today’s built environment. Early adaptors within the industry and government have successfully promoted this pioneering building technology. There is now almost a universal recognition of BIM within the construction industry, as well as widespread private sector investment in the implementation of BIM.

In terms of procurement, BIM is a powerful tool that allows construction companies to quantify the requirements of their projects. This enables control of spending and time management resulting in the reduction of wastage in these areas. It is essential that BIM is used in the early design stages of a project to ensure that there is capacity to not only clearly identify the elements of the project but through the use of BIM, companies are able to anticipate when they need to procure any given material or element. It is extremely difficult to transport the appropriate knowledge across all construction partners at the same time without the use of BIM, this can lead to the teams procuring the wrong materials at the wrong time, in different volumes.

In 2011 the Government committed to the use of ‘Level 2’ collaborative 3D BIM on all centrally-procured government projects by 2016. This is strategically planned as part of a larger overall strategy to combine the use of BIM with the latest modern technology, leading to the collaboration of the Government and construction industry working to enhance skills and reduce the cost of infrastructure. It has already been identified that BIM has contributed to savings of £804m in construction costs during 2013/14. The aim of this strategy is ultimately to position digitally enhanced construction as a prerequisite across the UK construction industry.

There has been scepticism, however, from some parts of the industry over the Government’s BIM strategy. Recent research, conducted by UK Construction Week in partnership with BRE, implies that three quarters of construction professionals do not believe that the industry is ready to reach the targets mapped out by the government. There seems to be a strong theme of companies claiming that there is a crucial lack of training in this area and that it is too costly and time consuming to invest in, particularly for SMEs.

Despite these claims the overall acceptance that BIM has gained still seems particularly prominent. From my experience, the general consensus from our industry implies that the growing integration of BIM will have a positive effect with only a small percentage of construction companies stating that they will not be using the technology. More money is now being invested in BIM, with large jobs kicking off this year applying the use of BIM in more sophisticated ways than ever before.

I feel that the Government’s implementation of BIM Level 2 will have a positive effect on our industry by bringing about progressive changes to the way that we work. Through the execution of this strategy, it is predicted that BIM will bring many employment opportunities, particularly for niche software developers and offsite manufactures, as well as upskilling current employees within our industry. By creating critical mass and certainty of demand, businesses should feel confident when investing in the development of BIM within their companies.

BIM is a key enabler for integrating offsite technology into construction practices – resulting in the delivery of low cost, low carbon assets. This is something crucial within government projects as there is an acute need for time efficient construction, as well as a vital responsibility for our industry and government to reduce our carbon footprint through the application of low energy buildings – resulting in lower costs for the end user.

Collaboration between teams is something that our industry is calling out for. BIM helps to provide the platform for teams to integrate and work together, as well as delivering valuable information to confirm that the finished project will meet performance expectations. It is the ideal tool for connecting the whole life cycle analysis of a project – embracing new technology and a new culture of working. This is something that I feel the industry would benefit greatly from and would help to deliver projects with heightened quality through efficiency of communications and accuracy of planning and design. I am eager to see the industry take this advanced method of construction to the next level.

B & K Structure’s BSkyB Believe in Better Building (BiBB) Development was recently awarded ‘BIM Project of the year’ at this year’s Celebrating Construction Awards. BIM played a fundamental part in delivering this project – with BIM being implemented across all teams. Only by maximising the benefits of BIM could the project be made possible in the challenging time frame that was presented by the client. All teams worked in a shared office in order to make real time decisions without any snags. It was in fact, estimated that without the utilisation of a shared model, a number of months would have been added to the project build time.

With the use of BIM going beyond the planning, design and construction phases to the whole life cycle analysis of the project, B & K Structures were able to gain information from conceptual ideas and building design in order to cost control and manage construction. The design process was made simple and repetitive – ensuring the strict time constraints were achieved as well as meeting the high performance requirements for the operational use of the building. This was truly an exciting build for B & K Structures. The project team has moved on to construct other projects together, including BSkyB 2 and BSkyB Health and Fitness – demonstrating their pride in the project and further utilising the relationships and communications that have been formed across the team.”

Login to post comments

Most Read

Astraseal commercial uses Rehau Gen…

01 Aug 2017 Doors, Windows, Facades & Balustrades

Introducing FlexiSet® by SureSet pe…

26 Jul 2017 Drainage & Landscaping

Fire Door Sets with a Difference

26 Jul 2017 Doors, Windows, Facades & Balustrades

Altro ideal for £25 million Welsh s…

26 Jul 2017 Floors, Walls & Ceilings

Find us on Facebook